Cbox Fast Build Modular Flat Pack Hospital Mobile Temporary Isolation Ward Portable Clinic Prefab Container House

Product Description

Flat Pack Container House Banner

💡Product Advantages

Product Advantages Diagram

📋Product Details

Product Specifications
Product name Flat pack container house
Size Standard size: 5800Lx2400Wx2896H mm or custom size
Capacity 100 sets per day
Sea freight loading 40HQ = 6-8 Units
Structural Details of Container House

🏢Container House Applications

Container Office Application

Office: Removable, Expandable, Reusable, 20 Years Life

Type: Flat Pack Prefab Container Office

Application: Temporary offices in construction sites, office built in workshops, low-cost outdoor offices.

Advantages: Short installation time (1-15 days depending on the project). A single container office only needs one day to complete the installation.

Container Dormitory Application

Dormitory: Fast, Fully Furnished, Stable

Type: Flat Pack Prefab Container Dormitory

Application: Due to site conditions, or the need to build a dormitory in a short period of time.

Advantages: Short installation time (2-15 days depending on the project). A variety of supporting facilities can be provided, such as beds, air conditioners, tables and so on.

Cabin Hospital Application

Cabin Hospital: Fast, Durable, Safe

Type: Flat Pack Prefab Container Cabin Hospital

Application: Responding to a sudden illness that results in the need to isolate patients or expand the hospital.

Advantages: The installation time is short (7-20 days depending on the project). Participated in or independently completed 15 makeshift hospital projects, including the famous project Huoshenshan Hospital.

Container Warehouse Application

Warehouse: Fast, Cheap, Durable

Type: Flat Pack Prefab Container Warehouse / Steel Structure

Scenario: Temporary or long-term use.

Advantages: Short installation time (2-15 days). Fireproof, waterproof, and moisture-proof with a 20-year service life.

⚙️Production & Manufacturing Facility

Frequently Asked Questions

1. How much manpower and time does it take to install the container?
It takes 4 workers approximately 2 hours to install 1 unit of the container house.
2. What is the fastest lead time?
This depends on the quantity. If it is a regular size, our standard lead time is generally 7-15 days after receiving the deposit.
3. Can you customize colors and sizes?
Yes, we gladly accept color customization (standard white is highly popular, but you can provide a color card number for reference). The maximum size customizable is up to 4m * 8m, which includes wind-resistant columns to support the top and bottom beams.
4. Do these container houses require a foundation?
If the land is stable and will not subside, there is basically no need to lay a foundation. Based on varying geological conditions, we will provide guidance, suggestions, complete foundation drawings, and video instructions for installation.
5. How are the container houses insulated?
The wall panels are standard 50mm rock wool sandwich panels. They can be upgraded to 75mm or 100mm thickness for extreme cold or hot weather. Additionally, the floors can also be covered with insulation.
6. How is product quality guaranteed?
Every step of production is checked by quality inspectors using vernier calipers to measure material thickness. Paint surfaces are inspected before packing, and wearing parts/spare materials are included in the shipment. Pre-delivery photos and videos are also sent to the customer for confirmation.

Related Products