China Steel Structure Expert
One-stop Service: Designing, Fabrication, and Installation
Standard: American, BS, Australian, and EU standard
Certification: ISO, CE, Lloyd's, SGS, BV
Designing Capacity
We have our own design team for high rise buildings.
Oversea Projects
Our products have been exported to over 55 countries, including USA, Mexico, Qatar, Saudi Arabia, Oman, Kazakhstan, Mongolia, Russia, Germany, France, UK, South America, Romania, Bulgaria, Japan, South Korea, Australia, Middle East, South Africa, Ghana, Kenya, Indonesia, Philippines, Maldives, and more.
Related Products
Our products include: Steel structural warehouse buildings, workshop buildings, agricultural buildings (horse/cattle barns, poultry houses), high-rise steel buildings, heavy industrial steel structure buildings, car parking facilities, steel structure aircraft hangars, schools, office buildings, prefab houses, container houses, truss roof warehouses, sandwich panels, corrugated steel sheets, and C&Z section steel purlins.
We also supply different kinds of doors, windows, and cranes related to projects.
Equipment & Professional Production Lines
- 6 sets of production lines for welded H beams, annual output is 60,000 tons.
- 2 sets of production lines for C section steel, yearly output is 5,000 tons.
- 2 sets of production lines for Z section steel, annual output is 5,000 tons.
- 25 sets of production lines for color-coated corrugated steel sheets, annual output is 8,000 tons.
- 3 sets of production lines for sandwich panels, annual capacity is 1,200,000 m².
- 2 sets of CNC plane drilling machines.
Packaging & Shipping
Packing: Materials will be packed into cartons or bundled. Big beams and columns will remain as they are, or parts will be packed onto large pallets and pushed into containers.
Shipping: Delivery time depends on order quantities. Generally, the delivery time is 30 days after receiving the deposit.
Our Services
| Service Stage |
Service Details |
| Pre-Sales Service |
- Consultant service (answering client's questions)
- Primary design plan (free of charge)
- Assisting client to choose a suitable construction plan
- Price calculation
- Business & technology discussion
|
| Sales Service |
- Submission of support reaction data for foundations
- Submission of construction drawings
- Providing requirements for embedding
- Construction manual
- Fabrication & packing
- Statistical table of materials
- On-time delivery
- Other client-specified requirements
|
| After-Sales Service |
- Installation supervision services
- Instructions for use after installation is completed
|
Frequently Asked Questions
QDo you supply installation services?
Yes, we do. Our workers and engineers can be sent to the construction site to assist with installation. The daily salary, accommodation costs, flight costs, and food fees are to be covered by the buyer.
QHow long can the space frame be used?
The lifespan of the main structure corresponds to its designed use life, which is 50-100 years (standard request of GB).
QHow long is the lifespan of the roof cover?
The lifespan of the PE coating is usually 10-25 years. The lifespan of the roof day-lighting panel is shorter, usually 8-15 years.
QWhat is the anti-rust treatment for steel structures?
Anti-rust treatments for steel structures include:
- Normal anti-rust paint
- Anti-rust paint with epoxy zinc primer
- Hot-dip galvanization
- Hot-dip galvanization + PU finish
- Powder coating
- Stainless steel structure: No.301/304/316 stainless steel structures
QHow do we cooperate on a certain project?
Firstly, please send us your project details and requirements. Then we will provide a design accordingly, free of charge. Afterwards, please check and confirm whether you approve of the drawings. If not, we will revise the drawings until your confirmation. Finally, we establish the deal with Trade Assurance.
Workflow: Project details → Drawings for your project → Revised drawings → Transaction confirmation with Trade Assurance
QWhat is the delivery time?
Delivery time depends on order quantities. Generally, the delivery time is 30 days after receiving the deposit.